Albuskjell 2/4 F comes on stream
Producing from 11 wells, the platform’s process facilities included a three-phase separator (12.2 x 2.9 metres) for gas, oil and water and a test separator (4.7 x 1.7 metres).
In addition came a glycol gas dehydrator (11.5 x 3.2 metres) with glycol recovery, a filter for produced condensate and a fiscal metering station for oil and gas.
Production from 2/4 F was blended with the respective streams from Albuskjell 1/6 A for onward export to 2/4 R via oil and gas pipelines with diameters of 18 and 24 inches respectively.
Installed in 1977, 2/4 F came on stream in July 1979. Its accommodation was replaced and expanded to 96 beds in 1983. Production ceased in 1990, with derrick and drilling modules removed in 1997.
Tor 2/4 E comes on streamNew hotel platform on line