Ekofisk 2/4 VB
- Ekofisk 2/4 VB was a part of the Ekofisk South project
- Installed 2012
- Producing May 16. 2013
- Also called “Victor Bravo”
So successful had the 2/4 VA facility proved to be that it was copied for 2/4 VB as an eight-well template, also delivered by FMC at Kongsberg.
Similarly, the wells on 2/4 VB were drilled by Maersk Innovator. The well operation department completed installation of the template, manifolds and casing for the eight subsea wells.
Seabed installations carried out by Subsea 7 comprised a five-kilometre pipeline for water from the Eldfisk Complex as well as a diver-installed T piece welded into the existing pipeline from Eldfisk 2/7 E to Ekofisk 2/4 K.
This assignment also covered laying three kilometres of umbilicals combining hydraulic lines and fibreoptic cables from 2/4 VA, so that 2/4 VB could also be remotely operated from land.

Hey! Just downloaded the MDMBetAPK from mdmbetapk. Seems pretty solid, lots of good games, and the interface is easy to navigate. So far so good!
Alright, gave ABCVIPU888 a shot. The selection is decent, and I managed to snag a few wins. Worth checking out if you’re looking for something new: abcvipu888.
V3Games, huh? The site is clean and loads fast, which is a major plus. The games themselves are cool too. Quick and easy access at v3games.