Ekofisk 2/4 C
This production, drilling and quarters (PDQ) platform is linked by a bridge to Ekofisk 2/4 X. Installed in 1972, it stands in 70 metres of water.
- On stream in 1974
- Combined production, drilling and quarters (PDQ) platform
- Linked by bridge to Ekofisk 2/4 X, and previously to Ekofisk 2/4 P, Ekofisk 2/4 Q and Ekofisk 2/4 H
- Part of the Ekofisk Complex
- Also called Ekofisk Charlie
Jacket piling was completed as early as December 1972, but delays with the topside modules – and their long voyage across the Atlantic – meant it was July 1973 before the DB 22 structure could be lifted into place.
The compressors for returning gas to the reservoir were not in place until 16-17 August, and were still being hooked up when the derrick became operational on 2 October. Production began in 1974.
Nine of the platform’s 12 wells are used for gas injection, while the other three produce oil, gas and condensate to be piped via bridges to Ekofisk 2/4 J for separation and processing.
More about platforms
close
Close

Yo, freecineapk seems pretty decent for watching movies on the go. The selection is alright, but hey, it’s free! A few buffering issues sometimes but overall, not a bad app. Download it here at freecineapk.
888casinologin, nothing surprising! The login process is smooth and the site itself is pretty user-friendly. Solid option for getting into your favorite casino games quickly. Login via 888casinologin.
Q36game sounds promising! I like what I see with the current game selection. Gameplay seems solid for each game. I give it a thumbs up! Try it at q36game.