Ekofisk 2/4 J

person Norwegian Petroleum Museum
This transport and processing platform came on line in 1998.
— Ekofisk 2/4 J. Photo: Jan A. Tjemsland/Norwegian Petroleum Museum
© Norsk Oljemuseum

All production from the Ekofisk Complex and the field’s satellite platforms goes to this processing and transport platform before gas is piped to Emden in Germany and oil to Teesside in the UK. As the central installation in the Ekofisk II development, 2/4 J receives production from the main field as well as Eldfisk and Valhall. Gas and oil also arrive from Gyda and Ula respectively for onward transmission to Emden and Teesside, and Tor output was handled until 2015.

Oil, gas and water are separated on 2/4 J, with the hydrocarbons pressurised at the start of their journey to Emden and Teesside. Equipment is also installed for gas injection into the reservoir.

The platform has the capacity to handle 21.1 million cubic metres of gas and 350 000 barrels of oil per day, as well as 90 000 daily barrels of oil from Eldfisk in a bypass. Daily water treatment capacity is 150 000 barrels.

Two compressors on 2/4 J ensure that gas from the Greater Ekofisk Area reaches European markets through the pipeline to Emden. They are driven by two 29 000 hp GE turbines.

Published 24. November 2018   •   Updated 1. October 2019
© Norsk Oljemuseum
close Close

5 Replies to “Ekofisk 2/4 Z”

  1. I switched from another site and the difference is night and day. The live dealer tables run smoothly and the chat feature with dealers makes it feel like I am in a real casino. Transfers are quick and secure too. zbetnetvn

  2. Finally found a reliable platform that actually delivers on its promises. The download process was quick and the interface adapts perfectly to my screen size. I enjoy the daily spins and the customer representatives always resolve issues professionally. Perfect for both casual fun and serious betting sessions. bg33download

Leave a Reply

Your email address will not be published. Required fields are marked *